PICTURES: THE BUILDING TAKES SHAPE | |
|
|
|
June 2, 2013: Windows and patio doors are being installed
June 9, 2013: View of the building from bottom of the new driveway
June 16, 2013: View from up the hill looking down at the rear of the the building
June 16, 2013: View of the building looking towards the front entrance
July 16, 2013: The rear balconies have been poured and the two-tone siding is going on
July 16, 2013: The driveway is starting to take shape
August 21, 2013: Natural gas line being placed
August 21, 2013: Road bed being prepared | |
|
|
|
|
| |