PICTURES: THE BUILDING TAKES SHAPE | |
|
|
|
March 22, 2013: Floor joists for the second floor are being placed
April 4, 2013: Second floor wall panels are being erected
April 18, 2013: Preparing the floor for the walls of the third floor
April 23, 2013: Starting build of the mock-up apartment
April 30, 2013: The third floor wall panels are being erected
May 7, 2013: The roof trusses are going up
May 7, 2013: Tub/Shower units going into the building
May 23, 2013: The roof is taking shape | |
|
|
|
|
| |