PICTURES: THE BUILDING TAKES SHAPE

Older Pictures

Newer Pictures

Doors and Windows

June 2, 2013: Windows and patio doors are being installed

Driveway and Building

June 9, 2013: View of the building from bottom of the new driveway

Rear and Side of Building

June 16, 2013: View from up the hill looking down at the rear of the the building

Front Entrance

June 16, 2013: View of the building looking towards the front entrance

Balconies and Siding

July 16, 2013: The rear balconies have been poured and the two-tone siding is going on

Driveway

July 16, 2013: The driveway is starting to take shape

Driveway

August 21, 2013: Natural gas line being placed

Driveway

August 21, 2013: Road bed being prepared