PICTURES: CONSTRUCTION PROGRESS | |
|
|
|
July 20, 2019: Loch Lomond Road side of the building
July 20, 2019: Loch Lomond Road side of the building
July 20, 2019: Blessing of the land and the development
July 27, 2019: Outside walls of the main floor taking shape
July 27, 2019: Outside walls of the main floor taking shape
August 4, 2019: Outside walls of the third floor going on
August 16, 2019: Inside framing work progressing on the first floor
August 17, 2019: Outside walls of the fourth floor going on; to the right are the floor joist panels | |
|
|
|
|
| |