Building

July 20, 2019: Loch Lomond Road side of the building

Building

July 20, 2019: Loch Lomond Road side of the building

Blessing

July 20, 2019: Blessing of the land and the development

Main Floor Walls

July 27, 2019: Outside walls of the main floor taking shape

Main Floor Walls

July 27, 2019: Outside walls of the main floor taking shape

Third Floor Walls

August 4, 2019: Outside walls of the third floor going on

Inside Framing Work

August 16, 2019: Inside framing work progressing on the first floor

Fourth Floor Walls

August 17, 2019: Outside walls of the fourth floor going on; to the right are the floor joist panels